Recovery body repair of buses Standard city
Recovery body repair of buses Standard city
The list of obligatory works when carrying out recovery repair:
- welding of a framework of a body, preparation for painting, painting;
- firm flooring of salon (replacement: plywood, self - tapping screws, sealant, etc. );
- soft flooring of salon (replacement: an autolean, glue, a cord for linoleum soldering,
self - tapping screws, alyum. profile);
- internal covering of salon (replacement: technical plate, self - tapping screws, rivets)
- office doors (replacement: a rubber profile, blinds, brushes, fingers - lower, traps);
- passenger sitting (banner of seats vinyl artificial leather)
- restoration of all electrical wiring:
- replacement of all external lighting engineering;
- frame plait (repair);
- torpedo plait (repair)
- conducting of the engine (repair)
- door conducting (repair)
- ceiling plait (repair)
- mudguards (replacement) of 4 pieces;
- repair of external plastic (at a possibility of carrying out repair);
- plastic arches of wheels (replacement) of 4 pieces;
- restoration of a partition of the driver;
- restoration of a handrail (peskostruyka, farbostatik).
