Installation of partitions
Installation of gypsum plasterboards.
The covering begins giposkartonny sheets of the first party with whole sheets which are established vertically. The leaf of a gipsokartn is not put on a floor, and hung out" with a space of 3-5 mm. For this purpose at installation it is enough to enclose temporary laying under a leaf. Fastenings of a gypsum plasterboard it is made by self-tapping screws. A step of fastening of the self-tapping screw of 250 mm, at a space from the sheet edge of 20 mm.
The last flight between racks is sewn up with a piece of the gypsum plasterboard found in the necessary size "in the place".
If necessary distributing of engineering communications is carried out (an elektika, bathroom equipment, telephony). In need of sheets of a giposkarton openings under installation of fittings are marked and are cut.
Then in space between racks the mineral heater is put. The heater is cut strips on all height of flight. Standard factory plates have the size standardized with technology of installation of gypsum cardboard. Therefore at most that should be made - to cut a heater roll lengthways and in half. In case of application of a slabby heater mats already have the necessary size for racks.
